The building, constructed in the 1970s, required an updated building automation system (BAS) to manage heating and ventilation and improve energy efficiency. Summit Building Consultants developed the scope of work, ran the RFP process, and managed the full project. There were no existing system drawings, and the client had received inconsistent quotes with widely varying equipment and pricing. Summit provided a detailed scope, added key energy monitoring devices, and implemented schedules and outdoor temperature-based calibration to reduce energy consumption.