Project Overview

Residents were experiencing repeated water leaks across five buildings, causing thousands in repairs. Summit conducted a site review, collected copper pipe samples for lab testing, and provided a detailed condition report with recommendations. We issued a scope of work, ran the RFP process, and managed the full re-pipe project, helping the strata move past conflicting contractor advice and take decisive action.

Challenges & Solutions

  • Persistent leaks: Provided clear technical recommendations to replace damaged systems
  • Conflicting contractor advice: Delivered an independent assessment and clear action plan
  • Biofilm/algae contamination: Identified oversized piping, dead legs, and a failed backflow preventer as root causes and resolved them during the re-pipe

Results & Value Added

  • Resolved longstanding green algae/biofilm issue
  • Replaced oversized and poorly routed piping
  • Prevented future leaks and reduced insurance risks and maintenance costs
  • Implemented a proactive maintenance plan for piping system longevity

Client Feedback

  • “Summit managed to figure out our green algae issue where numerous contractors had tried and failed. We are so happy to have this issue resolved.”